Skip to main content

COGO ENGINEERING AND MAPPING SURVEYORS

Setting out, earthworks and structural monitoring

Setting out and monitoring that keeps construction on line and on level

Setting out of structures, earthwork survey and volume calculation, structural monitoring and as-built surveys. Talk to our team about your site, timeline and the standard your project must meet.

Why setting out, earthworks and structural monitoring matters

On site, small positional errors turn into costly rework. Accurate setting out puts structures exactly where the design says, volume surveys keep payments fair, and monitoring shows early if a structure is moving.

Setting out of structures, earthwork survey and volume calculation, structural monitoring and as-built surveys.

  • Setting out
  • Earthwork volumes
  • Structural monitoring
  • As-built surveys

Our process

Step 1: Design check

We review the drawings and coordinates before any peg goes in.

Step 2: Setting out

Structures, alignments and levels are set out from verified control.

Step 3: Volumes and progress

Earthwork surveys measure cut and fill for accurate quantities and payment.

Step 4: Monitoring and as-built

We monitor structures over time and record the final as-built position.

Benefits of working with COGO

Less rework

Build it right the first time.

Fair payments

Measured volumes support valuations and claims.

Early warning

Movement is detected before it becomes a problem.

“Measure twice on paper and once on site, then check it again.”

Who needs this service?

  • Contractors and site engineers
  • Solar, road and building projects
  • Owners who need as-built records

What you receive

DeliverableWhat’s included
Setting-out dataPegs, offsets and check records
Volume reportsCut and fill quantities
Monitoring logsMovement over time
As-built plansFinal position of works

Every assignment is quoted on its scope, location and timeline. Contact us for a free, no-obligation quote.

Yes. We record the final position and levels of completed works as part of our setting-out service.
Our work includes a 4MW grid-connected solar PV plant and powerline routes of up to 100 km.

Ready to start your setting out, earthworks and structural monitoring?

Tell us about your project and we will reply with a clear scope, timeline and quote.