Project

33KV Mukono–Katosi Transmission Line

Client
Nile Heavy Engineering / UMEME
Location
Mukono to Katosi, Central Uganda
Period
Mar 2020 – Aug 2020
Funder
Government of Uganda
Status & sector

Completed | Energy | Water

Surveying and setting out a 40 km 33KV powerline from UETCL Mukono station to the NWSC Katosi water plant.

Aerial view of the Katosi water works

About the project

33KV Mukono–Katosi transmission line.

Project description

Surveying and setting out the proposed 33KV powerline route for transmission to the National Water & Sewerage Corporation (NWSC) plant. The route length was 40 km from UETCL Mukono Station.

Item Detail
Voltage 33KV
Route length 40 km
Start point UETCL Mukono Station
End point NWSC Katosi plant