About the project
Consultancy services for feasibility studies and preliminary design of four (4) large urban water supply systems in Eastern Uganda — Lot 3 in Soroti, Amuria and Kapelebyong.
Project description
Mapping the proposed pipeline routes on the ground and then generating profiles. This involved obtaining position coordinates along all proposed road reserves, twenty metres (20 m) from the road centre and at ten-metre (10 m) intervals. The whole area mapped covered 260 km.
| Item | Detail |
|---|---|
| Route length mapped | 260 km |
| Offset from road centre | 20 m |
| Observation interval | 10 m |
| Output | Pipeline route profiles |
Project location
Soroti, Amuria and Kapelebyong, Eastern Uganda.