About the project
Consultancy Services to Review and Update Existing Feasibility Studies and Engineering Designs, ESIA, RAP, Preparation of Tender Documents and ToRs for the Construction Supervision of Batch One (01) Road Infrastructure Sub-Projects under GKMA-UDP (P175660).
Project description
Our scope is to conduct survey control extension, levelling, topographic survey and cadastral survey for the RAP of all the roads in Cluster 3 of the project.
- Survey control extension
- Levelling
- Topographic survey
- Cadastral survey for the Resettlement Action Plan
Project location
Cluster 3 — Kira Municipality, Mukono Municipality and Mukono District.
Client: Atro E and M Ltd, for the Ministry of Kampala Capital City and Metropolitan Affairs (MKCC&MA) under the Office of the President.