Project

Survey for the 33KV Bukwo–Mbale Powerline

Client
Bamzee Engineering Company / UMEME
Location
Bukwo to Mbale, Eastern Uganda
Period
Jan 2020 – Aug 2020
Funder
Government of Uganda
Status & sector

Completed | Energy

Setting out a 100 km 33KV powerline route from the Bukwo generation plant on the Sipi River to Mbale substation.

Distribution pole overhead lines — COGO field photo

About the project

Survey for the 33KV Bukwo–Mbale powerline.

Project description

Setting out the proposed 33KV powerline route for transmission from the Bukwo generation plant (Sipi River) to Mbale substation. The route length was 100 km.

Item Detail
Voltage 33KV
Route length 100 km
Start point Bukwo generation plant (Sipi River)
End point Mbale substation