About the project
Consultancy services to undertake feasibility study, environmental and social impact assessment (ESIA) and abbreviated resettlement action plan (ARAP) for future rural electrification and connectivity grid expansion projects — Lot 2: North Eastern ST and Eastern ST.
Project description
Our scope is to conduct electrification verification of all the proposed powerline schemes and capture all unelectrified sub-county headquarters in all the districts provided. We also design powerline routes for all the schemes selected by the Ministry of Energy and Mineral Development (MEMD), and finally conduct an Abbreviated Resettlement Action Plan.
Scope at a glance
- Electrification verification of proposed powerline schemes
- Capture of unelectrified sub-county headquarters
- Powerline route design for MEMD-selected schemes
- Abbreviated Resettlement Action Plan (ARAP)
Project location
Jinja, Iganga, Bugweri, Kaliro, Luuka, Kamuli, Buyende, Bugiri, Mayuge, Namutumba, Busia, Tororo, Manafwa, Mbale, Namisindwa, Moroto, Amudat, Napak, Nabilatuk, Nakapiripirit, Serere and Soroti.


