Survey for the 33KV Bukwo–Mbale Powerline

Setting out a 100 km 33KV powerline route from the Bukwo generation plant on the Sipi River to Mbale substation.
33KV Mukono–Katosi Transmission Line

Surveying and setting out a 40 km 33KV powerline from UETCL Mukono station to the NWSC Katosi water plant.
Topographical Survey and Setting Out of the 4MW Grid-Connected Solar PV Plant

Topographic surveys, setting out of structures and as-built surveys for a 4MW grid-connected solar PV plant at Busitema University, Busia.
Demarcation of 132KV Transmission Line and Reserve Marker Posts, Bulambuli Resettlement Camp

Demarcating a 132KV transmission line corridor and planting reserve marker posts at the Bulambuli resettlement camp.
Wayleave Acquisition for the Accelerated Rural Electrification Programme

Mapping and valuing affected persons along new powerline routes in 20 districts of Eastern Uganda to bridge the electricity demand–supply gap.
Resettlement Action Plan (RAP) for Nengo Bridge 8MW Mini-Hydro Power Dam

A Resettlement Action Plan for the 8MW Nengo Bridge mini-hydro power dam on the Matano River, on the Rukungiri–Kanungu border.