Survey for the 33KV Bukwo–Mbale Powerline

Setting out a 100 km 33KV powerline route from the Bukwo generation plant on the Sipi River to Mbale substation.
33KV Mukono–Katosi Transmission Line

Surveying and setting out a 40 km 33KV powerline from UETCL Mukono station to the NWSC Katosi water plant.
Survey of Plots of Land for Post Bank Clients (Kyapa Loan Product)

Land surveys for beneficiaries of the Post Bank Kyapa loan scheme across the Sebei, Bugisu and Teso regions.
Topographical Survey and Setting Out of the 4MW Grid-Connected Solar PV Plant

Topographic surveys, setting out of structures and as-built surveys for a 4MW grid-connected solar PV plant at Busitema University, Busia.
Feasibility Studies and Preliminary Design of Four Large Urban Water Supply Systems (Lot 3)

Mapping 260 km of proposed pipeline routes and generating profiles for urban water supply systems in Soroti, Amuria and Kapelebyong.
Demarcation of 132KV Transmission Line and Reserve Marker Posts, Bulambuli Resettlement Camp

Demarcating a 132KV transmission line corridor and planting reserve marker posts at the Bulambuli resettlement camp.